· HO CHI MINH CITY, VN
TTQ Co. Ltd.Cashew Processing Machines
Process · Overview

Cashew Nut Processing: The Complete Process

Raw nut to premium kernel, stage by stage

Cashew nut processing converts raw in-shell nuts into clean, graded kernels through eight core stages — calibration, steaming, shelling, borma drying, humidification, peeling, grading and colour sorting, and packing with metal detection.

Updated August 2026 · TTQ Co. Ltd.

In short

Cashew nut processing is the sequence that turns raw cashew nuts (RCN) into edible, export-ready kernels. The eight core stages are calibrating raw nuts by size, steaming at 3–4 bar to soften the shell, shelling (cutting) to release the kernel, borma drying to take the kernel down to 3–4% so the testa turns brittle, humidification back to about 5–6% at the surface, peeling off the testa, grading and colour-sorting the kernels, and packing with metal detection. Modern plants run these as one PLC-automated line to maximise whole-kernel yield and minimise labour.

01

Conditioning: roasting vs steaming

RoastingSteaming
MethodRotating drums, 180–200°CHigh-pressure steam, 3–4 bar
Time8–12 minutes20–25 minutes
CNSLPartially liquefies / burns offSoftens shell, does not fully remove CNSL
Common inMany African processorsMost Asian facilities

Both weaken the shell without damaging the kernel. Capacity decides batch vs continuous: a 500 kg/h line typically needs 2–3 batch steaming units working in rotation.

02

Shelling: how the machines differ

Cutting machines

the modern standard. Calibrated blades cut the shell at a precise depth: deep enough to penetrate the shell, shallow enough to miss the kernel. TTQ uses a dual-blade system making two cuts so the shell splits open and the kernel stays whole. The specification that matters is whole-kernel recovery, and good machines hold 85–90%.

Centrifugal shelling

spins nuts against a hard surface, cracking the shell by impact. Useful for specific nut sizes but generally higher breakage.

CNSL collection

shelling machines should capture the shell liquid rather than waste it. It has industrial uses in resins and friction materials, so collecting it offsets processing cost.

03

Raw-nut grading and drying, sized properly

  • Grading — raw nut graders sort into five size grades, A+ to D, 500 kg/h for small operations up to 2,000+ kg/h industrial. Mixed sizes mean either under-processed large nuts or broken small ones.
  • Borma drying — kernels leave shelling at 9–12% moisture and must reach 3–4% before peeling, on a 13–14 hour batch cycle in the borma oven. Under-dried kernels peel poorly; over-dried kernels turn brittle and break. Size the dryer to the day: a 300 kg/h shelling line over 8 hours needs roughly 2,000–2,500 kg of dryer capacity, which is a 2 T or 4.5 T chamber.
04

The humidification step — where processors separate

After borma drying to 3–4%, kernels move to the humidifier room — Stage 09, a separate chamber from the dryer, built on the same platform at half the fan power. Saturated steam raises surface moisture to 5–6% while the core stays at 3–4%; TTQ chambers run 5–6 hours on a 0.5 T batch, 5–7 hours at 1–1.5 T and 3–5 hours at 2–4.5 T. That moisture gradient softens the testa while keeping the kernel firm.

Timing matters enormously: peel within 2–4 hours of leaving the humidifier. Leave it too long and the moisture redistributes, losing the gradient. Rush it and the surface moisture has not penetrated enough.

Capacity basis

TTQ works to an average of 35 kg/h per cutting head on Size A. A 10-head line therefore runs about 350 kg/h (410 kg/h on Size A+), and a 16-head line about 560 kg/h. Knife-configured machines run a little higher per station — a 16-knife machine reaches about 700 kg/h on Size A. Older published figures of 60–80 kg/h for a single head do not reflect this standard and have been corrected. All capacities are quoted per 8-hour shift.

05

The eight core stages

  1. Calibration — size raw nuts so they shell evenly
  2. Steaming — 3–4 bar for 20–25 min softens the shell for a clean cut
  3. Shelling / cutting — split the shell, release the kernel
  4. Borma drying — 13–14 h to 3–4%, which makes the testa brittle
  5. Humidification — surface back to 5–6% so the testa lets go
  6. Peeling — remove the skin, dry method
  7. Grading & colour sorting — W-grades, then optical defect removal
  8. Packing & metal detection — vacuum sealed, checked before dispatch
A note on the word "borma"

On this site borma always means the kernel drying oven, Stage 08 — the chamber that takes kernels down to 3–4%. Rewetting is a separate stage in a separate room (Stage 09, the humidifier). Some published sources use "borma" for the rewetting step instead; if you are comparing specifications between suppliers, check which stage the word is being applied to before comparing cycle times.

06

Manual, semi-automatic or fully automatic

The same eight stages can be run by hand, semi-automatically, or as a fully automatic plant. More automation means higher whole-kernel yield and lower labour per tonne.

07

Every machine on the line

Automatic Raw Cashew Nut Grading Machine
Pre-processing · Stage 01

Automatic Raw Cashew Nut Grading Machine

Size before you shell

Open →
Cashew Nut Shelling Machine
Shelling · Stage 02

Cashew Nut Shelling Machine

Crack the shell, keep the kernel

Open →
Cashew Nut Cutting Machine
Shelling & cutting · Stage 02

Cashew Nut Cutting Machine

Clean, consistent kernel separation

Open →
Cashew Dryer Machine (Borma)
Drying · Stage 04

Cashew Dryer Machine (Borma)

Controlled borma drying

Open →
Cashew Peeling Machine
Peeling · Stage 05

Cashew Peeling Machine

High whole-kernel yield, dry-peeled

Open →
Cashew Grading & Sorting Machine
Grading & sorting · Stage 06

Cashew Grading & Sorting Machine

W180 to W450, sorted by size and colour

Open →
Cashew Vacuum Packing Machine
Packing · Stage 07

Cashew Vacuum Packing Machine

Nitrogen-flush, export shelf life

Open →
Cashew Vacuum Packing Machine
Packing · Vacuum & nitrogen

Cashew Vacuum Packing Machine

Nitrogen-flush, export shelf life

Open →
Cashew Steaming Machine
Pre-processing · Steaming

Cashew Steaming Machine

Soften shells, protect kernels

Open →
Automatic Cashew Shelling Machine
Shelling · Fully automatic

Automatic Cashew Shelling Machine

Fully automatic, minimal hands

Open →
Cashew Scooping Machine
Shelling · Kernel scooping

Cashew Scooping Machine

Extract the kernel, whole

Open →
Cashew Kernel Humidification Chamber
Drying & peeling · Conditioning

Cashew Kernel Humidification Chamber

Condition moisture for clean peeling

Open →
Automatic Cashew Peeling Machine
Peeling · Fully automatic

Automatic Cashew Peeling Machine

Automatic dry-peeling at volume

Open →
Cashew Pouch Packing Machine
Packing · Retail pouches · Guide

Cashew Pouch Packing Machine

How retail pouch packing works — and who supplies it

Open →
Cashew Nut Roasting Machine
Value-add · Roasting

Cashew Nut Roasting Machine

Even roast, edge to edge

Open →
Cashew Sugar Coating Machine
Value-add · Coating

Cashew Sugar Coating Machine

Glaze, coat, candy

Open →
Cashew Dicing Machine
Value-add · Cutting & dicing

Cashew Dicing Machine

Splits, pieces and dice

Open →
Cashew Color Sorter
Grading & sorting · Optical

Cashew Color Sorter

CCD optics catch every off-colour

Open →
Cashew Metal Detector
Utility · Food safety

Cashew Metal Detector

Catch metal before it ships

Open →
Cashew Moisture Meter
Utility · QC instrument

Cashew Moisture Meter

Know the moisture, hit the grade

Open →
Cashew Shell Burner
Utility · Energy

Cashew Shell Burner

Turn shell waste into heat

Open →
Wood Chip Boiler
Utility · Energy

Wood Chip Boiler

Biomass steam for the line

Open →
Air Compressor
Utility · Pneumatics

Air Compressor

Clean air for every actuator

Open →
Diagrams

The process, drawn

Process diagram

The eight core stages

Raw cashew nut in at one end, packed export kernel out at the other. Moisture is the thread: every stage either takes it out or puts a controlled amount back.

Calibration Size grading 8–10% moisture
Steaming Shell softened 3–4 bar · 20–25 min
Shelling Kernel released 85–90% whole
Borma drying Testa turns brittle 13–14 h → 3–4%
Humidification Surface rewetted → 5–6% surface
Peeling Testa removed 80–90% first pass
Grading & sorting Size then colour W180–W500
Packing Vacuum + metal check 3–5% moisture

Capacities and cycles are Size A basis, per 8-hour shift. Stages 04 and 05 are separate machines in separate rooms — the borma oven dries, the humidifier puts moisture back.

Process diagram

The moisture ladder

Every number a cashew plant lives or dies by is a moisture number. Read left to right — this is the same journey as the eight stages, seen through water content.

RCN intake Wetter risks mould, drier shatters 8–10%
After steaming Shell pliable, cuts instead of shattering 9–12%
After borma drying Testa brittle enough to separate 3–4%
After humidification Core stays at 3–4% — the gradient is the point 5–6% surface
Packed kernel Shelf-stable under vacuum 3–5%

Stages 03 and 04 look contradictory and are not. Drying makes the skin brittle; humidification softens only the outer surface so the skin lets go without the kernel softening with it.

Process diagram

Where the raw nut actually goes

One tonne of RCN leaves the plant as three streams, not one. The kernel pays the wages; the shell pays the fuel bill.

Kernel stream ≈ 22–24% of intake, packed and saleable
Shelled kernel Out of the shell, ideally whole
Dried & humidified Conditioned for peeling
Peeled & graded W-grades, colour sorted
Packed Vacuum, metal-checked
Shell stream ≈ 70% of raw-nut weight
Separated at shelling Sieve and blower
CNSL press 20–25% of shell weight
De-oiled cake Still burns
Shell burner → boiler >4,000 kcal/kg
Testa stream Peel waste
Removed at peeling Air-carried to collection
Fuel, mulch or feed Not a CNSL source

The testa is the thin brown skin taken off at peeling. CNSL comes from the SHELL, not from the testa or the husk — a distinction worth holding onto when reading supplier literature.

Answers

Frequently asked questions

What are the stages of cashew processing?
Calibration, steaming, shelling (cutting), borma drying, humidification, peeling, kernel grading with colour sorting, and packing with metal detection — eight core stages from raw nut to sealed kernel.
Can cashew processing be fully automated?
Yes — a fully automatic PLC line runs all eight stages with automated handling between them, maximising yield with minimal labour. Drying and humidification stay batch stages, so a complete plant cannot run continuously the way a shelling line can.

Talk to a cashew engineer

Tell us your target capacity, grades and location — we’ll come back with a costed proposal.

Request a quote Contact TTQ