· HO CHI MINH CITY, VN
TTQ Co. Ltd.Cashew Processing Machines
Process · Cooking / steaming

The Cashew Cooking (Steaming) Process

Commercial plants "cook" raw cashew nuts by steaming them at 3–4 bar for 20–25 minutes before shelling — softening the shell and conditioning the caustic shell liquid so kernels cut cleanly.

Updated August 2026 · TTQ Co. Ltd.

In short

In commercial cashew processing, "cooking" almost always means steaming: raw nuts are pressure-steamed at 3–4 bar for about 20–25 minutes before shelling. Steaming softens and loosens the hard shell so cutting blades split it cleanly, and it conditions the caustic cashew nut shell liquid (CNSL) so it is easier and safer to handle. The result is lower kernel breakage and higher whole-kernel yield. Steam is usually raised from the plant’s own shell-fired burner or a biomass boiler.

Steaming is the quietest stage on a cashew line and the one that decides most of the outcome. Get it right and the shell cuts cleanly, kernels come out whole and the CNSL stays where you can collect it. Get it wrong and every machine downstream is working against damaged material it cannot repair.

01

What happens during cooking

Reception and cleaning

raw nuts arrive, are cleaned of stones and field debris, and graded by size so a single steaming programme suits the whole batch.

Loading

nuts are charged into the steaming vessel — TTQ builds 300, 600, 800 and 1,000 kg batch units, the largest being a vertical steam tower with two wagons.

Steaming

saturated steam at 3–4 bar for 20–25 minutes. Heat and moisture soften the shell and loosen the kernel inside it. That is the cycle on the 600, 800 and 1,000 kg machines; the 300 kg batch design runs 40–60 minutes.

Cooling and rest

nuts come out and are allowed to equalise for 12–24 hours before cutting. Cutting a nut straight out of the steamer gives poorer results than letting it stabilise, and the rest period is free — it costs floor space, not money.

To shelling

the shell is now pliable enough to cut rather than shatter.

02

Why it matters more than it looks

An unsteamed or under-steamed shell shatters when the blade meets it, and the fragments take kernel with them. An over-steamed nut has a soft kernel that marks and breaks in handling. The window between those two failures is what the equipment is for, and holding it consistently across a batch is what separates a good steamer from a cheap one.

03

What optimised steaming is worth

AspectWithout optimised cookingWith optimised steamingEffect on profitability
Kernel recovery20%30%+50% yield value, about $200 per tonne
Breakage rate15–20%Under 3%+15% premium kernels
Processing time10 hours per tonne6–7 hours per tonne+40% throughput
WasteHigh, around 10%Low, around 3%Around $30,000 a year saved
CNSL revenueMinimal$150 per tonne+10% total income

Illustrative model, not a quotation or a guarantee — these are the figures the equipment has to justify, on a one-tonne-per-batch basis at indicative kernel and CNSL market prices. Your own numbers will move with RCN cost, grade mix and local energy prices. The largest single line is kernel recovery: the gap between 20% and 30% dwarfs everything else on this table.

04

How it is done regionally

RegionMethodBreakageUniformityProfitability gain
IndiaDrum or boiler steaming5–8%High — about 95% uniformity+20%
AfricaOpen boiling or steaming10–15%Medium — variable+15%
BrazilPressure steaming4–6%High, with an organic focus+25%

Reported regional practice, for comparison — the method is what differs, not the physics. TTQ equipment works to one basis regardless of region: 3–4 bar for 20–25 minutes. The African figures are the upgrade opportunity, not a criticism: open boiling is what is available, and moving to controlled steaming is the single highest-return equipment change on that continent.

India (725,000 MT in 2025)

drum steaming and boiler systems dominate, with well-developed operating knowledge and high batch uniformity feeding a strong export trade.

Africa (about 60% of global production; Côte d’Ivoire alone 1.15 million MT)

open boiling remains common, which is why breakage runs 10–15% and consistency varies. Controlled steaming equipment typically pays back faster here than anywhere else.

Brazil (135,000 MT in 2025)

a hybrid of traditional roasting and pressure steaming, with a strong organic and premium market focus that rewards low breakage.

05

The steam boiler side of it

Steam quality

saturated steam at a stable pressure. Fluctuating supply gives uneven conditioning within a single batch.

Capacity sizing

the boiler serves steaming, drying and often humidification. Size it on total simultaneous demand, not on the steamer alone.

Fuel

cashew shell from your own shelling line is the obvious fuel and closes the loop. Shell-fired boilers need handling and storage but remove a purchased fuel line entirely.

Safety and certification

pressure vessels carry real risk. Insist on proper certification and safety interlocks, not just a pressure gauge.

Batch scheduling

a 500 kg/h shelling line typically needs 2–3 batch steaming units working in rotation so the cutter never waits.

Equipment

TTQ builds steaming systems, shell-fired boilers and the shelling lines they feed. Capacity figures are quoted per 8-hour shift. See cashew steaming machine for the equipment and cashew shell burner for closing the fuel loop with your own shell.

06

Why cook (steam) before shelling

  • Softens the shell for a clean, low-breakage cut
  • Conditions the caustic CNSL for safer handling
  • Raises whole-kernel yield

The steaming machine runs timed pressure cycles; heat typically comes from the shell burner.

Some older methods roast or drum-roast raw nuts in shell instead of steaming; steaming is the standard for modern, high-yield lines.

Diagrams

The process, drawn

Process diagram

One steaming batch, start to cutter

The quietest stage on the line and the one that decides most of the outcome.

Load 300, 600, 800 or 1,000 kg By model
Steam Saturated steam from the boiler 3–4 bar · 20–25 min
Cool and rest Nuts equalise before cutting 12–24 h
To shelling Shell now cuts instead of shattering 9–12% moisture

Every model runs the same 20–25 minutes at 3–4 bar, on boiler steam. The 300 kg batch design is the exception on both counts: 40–60 minutes, and it can be heated by wood, gas, electricity or a burner instead. The rest period costs floor space, not money.

Answers

Frequently asked questions

Why are cashews cooked before shelling?
Steaming (cooking) softens the shell so it cuts cleanly and conditions the caustic shell liquid, raising whole-kernel yield.
How long are cashews steamed?
Typically 20–25 minutes per batch at controlled pressure, then cooled and rested before cutting.